Dear Poulo,

I am the new project engineer in sustaining investment,

And
and the Moisturemoisture analyses project hadhas been handhanded over to me.

AsIn brief: in vale Oman now we have 3 moisture analyses as following follows:

Units Manufacturer Model Number Documents available Units situation PR reference
MA 1 RTI Moistscan MA-500HD • Product brochure
• Drawings
• Technical Offer Installed on TR 1010.05 without commissioning PR# 13009329
MA 2 & 3 Scantech TBM230 • Photos
• High level
Productproduct brochure
In the store without installation and commissioning -

The next step will be going forward to commission all the 3
analyzeranalyzers.
For commissioning we have 2 available options :
Option 1 : RTI will commission the Moistsan MA 500HD,
and Scantech will commission the 2 TBM230
Option 2: One vendor to commission all the 3 units.
We suggest to proceed with option 2
witchwhich is better from a commercial point of view.

If we proceed with option 2 we need more technical information to make sure that one
vendervendor is capable to doof doing the job without technical risk.
We request from you
, if possible, to facilitate the communication with both vendors, which will help in coming intoto a conclusion.

The text above was approved for publishing by the original author.

Previous       Next

Essayez gratuitement

Veuillez entrez votre message.
Veuillez sélectionner la langue pour la correction

Cliquez ici si vous souhaitez corriger un document Word.

eAngel.me

eAngel.me is a human proofreading service that enables you to correct your texts by live professionals in minutes.